|
volume 2004
|
suit:
|
685.000 pcs
|
sportscoat:
|
462.000 pcs
|
trousers (separate)
|
1.420.000 pcs
|
waistcoats (separate):
|
105.000 pcs
|
overcoats:
|
202.000 pcs
|
jackets:
|
197.000 pcs
|
|
|
|
supply chain
|
1.
|
Sourcing of all fabrics and acessories through Kaiser.
|
2.
|
Capacity- and productionplanning at Kaiser.
|
3.
|
Design/sketching as well as pattern design and grading at Kaiser layers are transfered to the manufacturers` computer aided cutting systems via internet. Decreasing product-time-to-market.
|
4.
|
Shipment generally from Kaiser-headquarter in Germany: final quality inspection (random check acc. DIN: ISO 2859-1) / fixing computertickets/ controlling shipmentdetails.
|
|
|
|
production:
|
manufacturing:
|
own factories in China, the Baltikum and in Ukraine.
|
lead times:
|
14 days possible (including transportation), normally 4 weeks.
|
|
|